Construction and finishing of a residential building (Sixth of October City)

  • Home
  • Project
  • Construction and finishing of a residential building (Sixth of October City)

Construction and finishing of a residential building (Sixth of October City)

The Sixth of October City residential building project was a comprehensive undertaking that encompassed all stages of construction and finishing. The project spanned seven months, from October 2010 to April 2011, and was executed within a total budget of 275,000 Egyptian Pounds.

Throughout the construction phase, meticulous attention was paid to every detail, ensuring the highest standards of quality and adherence to design specifications.  electrical wiring, and HVAC.

  • Project: Residential Building Construction and Finishing Project
  • Owner: Mr. Michael Abdo Ibrahim
  • Timeline: October 2010 – April 2011
  • Total Cost: 275,000 Egyptian Pounds
 
 

The Executed Items:

This comprehensive construction project includes excavation, backfilling, and insulation, as well as the construction of the building’s concrete structure. The structural work encompasses normal and reinforced concrete for the foundations, columns, and slabs for the ground, first, and second floors. Additionally, the project involves the construction of a fence around the property.

  • Excavation, backfilling, and insulation works.
  • Concrete structural works for the entire building, including normal and reinforced concrete for the building’s foundations, columns, and slabs for the ground, first, and second floors.
  • Fence construction works.